Launch

1. How do move plan versions to run time after an initiative is approved?

Movement of approved plan data to runtime must be done through DevOps. Configure Azure storage location to auto-download plan versions upon getting approved to a storage location or you can use general inquire to download again. Navigate to launch module, setup the plan determinations for the approved plans. Create a package by the selecting the plan versions you need and assign them an effective date(s). These package must be downloaded from iFoundry and moved to integration tools like Zira, TFS etc. Movement of data is managed by the integration tools.

2. What is release package?

Bundling of all the information related to one or multiple approved plans to make them available for run time.

3. What is plan determination?

Plan determination allows you to create various parameters based on which the products should be available for run time.

4. How do I create plan determination factors?

Launch => plan determinations => configure parameters.

5. How do I provide values for the effective dates?

By setting effective date and expiry date for each product offerings.

6. Can I map same plan version to different effective dates?

Yes, however dates must be always in ascending order.

7. Can I map same plan version to different plan determinations?

Yes. However, more than one plan should not be mapped to same determination factor.

8. Can I add same plan versions into different packages?

Yes,